Friday, October 16, 2009

Week 9 - Windows and doors installed

Frame is now complete. Glass windows and doors have been installed. Next will be the Lock-up stage which includes the installation of the tile roof and brickworks.

Facade of the house. On the right side is the garage while on the left side, with the large window is the master bedroom


The alfresco / outdoor room. One of the two upgrades we included in the house. The other one is the Rumpus/Home Theater room. Aside from the Master Bedroom, these two areas of the house are my faves. Of course, Kareen loves the kitchen!


The Rumpus/Home Theater area


The Master Bedroom


Here's the side of the house


The backyard. Still enough space for garden and playground


Garage area


View from the garage. Construction sites all around