Saturday, October 31, 2009

Week 11 - Plumbing complete

Lock-up stage is still in progress. Plumbing and ducted heating connections are done. Two solar panels at the roof for the hot water system were also installed.

All wrapped up with foil and ready for bricking


Aluminium foil wrap for insulation


Plumbing in the toilet


Bath tub frame


The front door. This will be painted in Manor Red to match our garage door colour